OFFSHORE VAWT TIE TO GRID
Offshore HV Transmission Lines exist, and/or can be built, to allow the BEST VAWT 36M towers, each structure producing 36 - 48Mw, and connected to the Grid. Offshore FARMs can be populated with a greater number of structures, in a closer grid pattern, which translates to less connecting materials.